Tender for Supply, Delivery, Installation, Testing and Commissioning of SARES Phase 4 Solar Power Project in Telang Usan A, Miri, Sarawak (Civil & Building Works – Civil Structural – Solar Powerhouse using IBS System)(Contract Ref No: SWK.Energy R&D 43/2018)

Project Summary:

The company has acquired the SARES project that was located at Telang Usan, Miri, Sarawak. The value of this project was worth RM 3,000,000.00. Long Panai, Long Iman, Long Terawan, Long Kawa, Long Sian, and Long Meraan were among the regions covered by this solar project (SARES) in Telang Usan, Miri, Sarawak. The project started from 17/06/2019 and completed on 16/12/2019. The client for the project was Sarawak Energy Berhad. The main contractor was Gabungan Binaan Jurutenaga Sdn Bhd SARES is an innovative government-community partnership model and it is an initiative by the Sarawak Government to provide electricity supply in the rural areas. Renewable energy from solar is utilised for the power generation.