Tender for Supply, Delivery, Installation, Testing and Commissioning of SARES Phase 4 Solar Power Project in Belaga, Kapit, Sarawak (Civil & Building Works – Civil Structural – Solar Powerhouse using IBS System)
(Contract Ref No: SWK.Energy R&D 05/2018)

Project Summary:

In Belaga, Kapit, the company obtained a project under Sarawak Alternative Rural Electrification Scheme (SARES) with a contract amount of RM 1,777,800.00. Long Tanyit, Long Abit, Long Lidem, Naha Jaley and Punan Sama were the covered areas for the SARES project. The project started on 31/07/2019 and ended on 30/01/2020. The client for the project was Sarawak Energy Berhad. The main contractor was Green Source Energy Sdn Bhd. SARES is an innovative government-community partnership model. It is an effort made by the Sarawak Government to provide 24-hour reliable electricity supply for the rural communities in Sarawak. Utilization of solar energy will reduce the dependency on costly diesel generators which are commonly used in the rural areas. Solar panels are the core of this project to convert solar energy into electricity.